What information does a boring contractor need to quote a bore?

By the Underground Architects team · Updated October 28, 2026

Quick answer

To quote a bore, a contractor needs the plans or prints, the route and approximate length, the size and type of pipe or conduit, where handholes and boxes go, what surface the bore crosses, and anything known about the soil and existing utilities. Timing, traffic control, permit and restoration needs matter too. The more of this you send up front, the faster and more accurate the quote.

A bore quote is only as good as the information behind it. When a contractor has to guess at the route, the soil or what is already in the ground, the quote either carries extra padding or leaves room for surprises later. Sending the right details up front gets you a faster, cleaner number.

The quote checklist

What to send Why the contractor needs it
Plans or prints Shows the route, bore sections, crossings and handhole locations
Route and approximate length Length is one of the biggest factors in bore effort
Pipe or conduit size and type Larger diameters can mean reaming and more pullback work
Number of conduits Changes the size of the bore and the pullback
Required depth Affects the bore path and the entry and exit setup
Handholes or boxes Each one is placed and set as part of the job
Surface along the route Pavement, concrete, landscaping or open ground
Crossings Roads, driveways, waterways and other obstacles
Known soil or rock conditions Ground conditions change how hard the bore is
Known existing utilities Shapes the path and any extra verification
Timing Start date, deadlines and work-hour limits
Traffic control and permits Needed for work in or near roads and rights-of-way
Restoration requirements Who restores pits and surfaces, and to what standard
Records required The as-built format the owner wants at the end

The details that change a quote the most

Length, diameter and soil

Bore cost varies a lot with the type of soil, the length of the bore and the diameter of the pipe. These three are the first things a contractor looks at. Coarse gravel, cobbles and boulders are known problem soils for directional drilling, and some hard or fractured rock can make a bore impractical. If you have soil reports, earlier bore logs from the area or even notes from past digging nearby, send them.

What is already underground

Records of buried lines are often wrong. A Federal Highway Administration summary of a Purdue University study notes that existing records of underground site conditions are usually incorrect, incomplete or otherwise inadequate. The same summary lists fewer utility conflicts and fewer claims and change orders among the benefits of knowing where utilities really are. Share whatever utility information you have, even if it is incomplete.

Before work starts, the excavator will also need to give notice through 811. Texas law lists what that notice includes, such as the location of the work, the start date and time, and the expected completion date. Having those details ready helps the job move from quote to start. See calling 811 in Texas.

The surface and the crossings

A bore that runs under open ground is a different job from one that crosses a busy road or a concrete driveway. Tell the contractor what sits on top of the route and where the crossings are. Road work may also need traffic control and permitting.

Restoration and records

Ask up front what happens at the end. Bores leave entry and exit pits that need restoration: concrete, asphalt, soil or landscaping. And most owners want an as-built record showing where the line actually went. Say what format you need.

How to send a bid request that gets a fast answer

  1. Attach the plans or prints, even if they are preliminary.
  2. Describe the route in a sentence or two, with the approximate length.
  3. List the materials: pipe or conduit size, type and count.
  4. Note the surface and crossings.
  5. Share what you know about soil and existing utilities.
  6. Give the timing, including any deadlines.
  7. Say what else is needed: traffic control, permits, restoration, as-built format.

What happens next

A good contractor will read the plans, ask about anything unclear, and come back with a quote that matches the job. At UGA, Drillbert, UGA’s AI operations agent, is getting ready to read plans and orders when they come in and help us build quotes faster. Our team makes the final call. Learn more on the technology behind UGA.

UGA, based in El Paso, Texas, provides horizontal directional drilling and fiber and telecom conduit boring. When you are ready, request a bid.

This article is general information. What a contractor needs can vary by project, owner and location.

Sources

Related services

Answers

More questions

Often you can get a rough number from a route description and length, but it will carry more unknowns. Plans or prints let the contractor count bore sections, handholes and crossings, which makes the quote more accurate and reduces surprises later.

Ground conditions change how hard and how long a bore takes. Coarse gravel, cobbles, boulders and some hard rock are known problem conditions for directional drilling, so anything you know about the soil helps the contractor price the work fairly.

Because records of what is underground are often incomplete. Knowing about existing lines early helps the contractor plan the path, the depth and any extra verification needed before drilling.

It should at least be discussed. Bores leave entry and exit pits, and sometimes pothole sites, that need to be closed and restored. Ask whether concrete, asphalt or landscaping repair is included.

If the work is in or near a road, traffic control and permits may be needed. Say so in your request, along with the agency or owner involved, so the contractor can plan for it.